Erection of Spiral Assembly with the help HOT Crance manufactured by us. This preponed erection schedule by six months. Originally it was to be erected by EOT Crane which was operational only after complete height of column was achieved.
Erection of Spiral Assembly with the help HOT Crance manufactured by us. This preponed erection schedule by six months. Originally it was to be erected by EOT Crane which was operational only after complete height of column was achieved.