Penstock Fabrication - 3 Metre Dia, Steel Grade 517F

Fabrication of Bend for Rognichu HEP


Fabrication of Oriface



Survey of elevation at no. of points for FINITE ELEMENT ANALYSIS with the help of total station.

Presently Under Execution
Emergency Gate after application of Primer
Emergency Gate-application of Coal Tar Paint
Underwater diving services being provided by us for Cleaning the groove/guide for proper movement of under sluice emergency gatewith the help of divers, repairing/replacing the embedded parts, concreting etc.
- Design, Manufacturing and Supply of all equipments and materials for 4 Nos. Diversion Tunnel Gates including installation, testing and commissioning at Teesta H.E. Project (Stage V), Sikkim
- Modificaton of Tala Surge shaft Gates Hoisting Mechanism and its Latching arrangement at Tala HEP, Bhutan
- Design, Engineering, Fabrication & Manufacturing, Supply, Transportation, Insurance, Erection, Testing, Commissioning, Guarantee Test, Operational acceptance, handing over, clearance of site etc of Hydro Mechanical Job At KAMBANG HEP in Arunachal Pradesh
- Hydro Mechanical works – Rangit Hydro Electric Project - Sikkim